Jump to content

Ground up rebuild


Recommended Posts

ae198f16e88570670bef4c14b00ca71b.jpg

The anticipation was killing me so I drilled and tapped the hole, it wasn't exactly perfect so I globed the hole with red lock tight and screwed it in as tight as possible by hand I didn't want to risk stripping it with torquing it down too tight I think it will be perfect once the lock tight dries!!!

 

 

Sent from my iPhone using Tapatalk

Link to comment
Share on other sites

Oooh aaaahhh..... Wait, I think you are missing part of the case.

Yea phone died from playing music while I was applying the 1211, my first time sealing up the bottom end that shit is messy and I think I puta little much on lol oh well better too much than not enough

 

 

Sent from my iPhone using Tapatalk

Link to comment
Share on other sites

It's looking good though. Is the new powder coating giving you any troubles when putting back together? Like rethreading etc.

Yea before I started any thing I ran a tap through every hole on the frame and every part that was powdered... If you want I can list all the tap sizes you will need

 

 

Sent from my iPhone using Tapatalk

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Loading...
×
×
  • Create New...